Page Southerland Page
Below are the Projects that Amtech Solutions has completed for Page Southerland Page
![Amtech-Client-Featured-Page-1](https://amtechsls.com/wp-content/uploads/2022/10/Amtech-Client-Featured-Page-1.png)
![Dallas ISD - W.W. Samuell High School Roof Design](https://amtechsls.com/wp-content/uploads/2022/10/Amtech-Projects-AEFirms-Page-Architects-Dallas-ISD-Samuell-HS-Aerial-480x317.jpg)
Dallas ISD – W.W. Samuell High School Roof Design
Amtech worked with Page Southerland Page Architects to ensure the that the work performed was within the codes for the City of Dallas, and the guidelines of Dallas ISD.
Project Service:
Roof & Building Envelope Consulting
Project Scope:
Site Assessment, schematic design, construction documentation and construction administration.
Project Construction Cost:
$2,560,000.00
Project Sq Footage:
170,000 SF
![Garland ISD - Hudson Middle School Roof Replacement](https://amtechsls.com/wp-content/uploads/2022/10/Amtech-Projects-AEFirms-Page-Garland-ISD-Hudson-MS-RR-480x433.png)
Garland ISD – Hudson Middle School Roof Replacement
Amtech worked with Page Southerland Page Architects to ensure that the work performed was within the codes for the City of Garland, and the guidelines of Garland ISD.
Project Service:
Roof & Building Envelope Consulting
Project Scope:
Roof design and construction administration services
Project Construction Cost:
$2,000,000.00
Project Sq Footage:
134,000 SF
![Garland ISD - Abbett Elementary School Roof Replacement](https://amtechsls.com/wp-content/uploads/2022/10/Amtech-Projects-AEFirms-Page-Garland-ISD-Abbett-ES-Aerial-480x381.png)
Garland ISD – Abbett Elementary School Roof Replacement
Amtech worked with Page Southerland Page Architects to ensure that the work performed was within the codes for the City of Garland, and the guidelines of Garland ISD.
Project Service:
Roof & Building Envelope Consulting
Project Scope:
Roof design and construction administration services
Project Construction Cost:
$1,500,000.00
Project Sq Footage:
24,000 SF